| 1 |
Roads & Highways Dept. Rangamati |
Manufacturing of Portable Steel Bridge for Kaptai-Rangamati link Road (S-S-R) Length 50 Feet |
1986-1987 |
| 2 |
Bangladesh Water Development Board, Hathazari, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 100 Feet |
1986-1987 |
| 3 |
Bangladesh Oil, Gas & Mineral Corporation, Brahmanbaria |
Manufacturing of Portable Steel Bridge for Rashidpur, Sylhet (D-S-R) Length 100 Feet |
1987-1988 |
| 4 |
Lohagora Upazila Parishad Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 100 Feet |
1988-1989 |
| 5 |
Bangladesh Oil, Gas & Mineral Corporation, Brahmanbaria |
Manufacturing of Portable Steel Bridge for Noapara, Hobiganj (D-S-R) Length 40 Feet |
1988-1989 |
| 6 |
Bangladesh Oil, Gas & Mineral Corporation |
Manufacturing of Portable Steel Bridge at Noapara, Hobiganj (D-S-R) Length 30 Feet |
1988-1989 |
| 7 |
Bangladesh Navy |
Manufacturing of Portable Steel Bridge for Bhatiary, Chittagong (S-S-R) Length 50 Feet |
1988-1989 |
| 8 |
Chittagong City Corporation, Shitaljharna, Panchlaish Ward, Chittagong |
Manufacturing of Portable Steel Bridge for Mirzapool (S-S-R) Length 50 Feet |
1989-1990 |
| 9 |
L.G.E.D. Damurhuda Thana, Chuadanga |
Manufacturing of Portable Steel Bridge (S-S-R) Length 50 Feet |
1989-1990 |
| 10 |
Bangladesh Oil, Gas & Mineral Corporation |
Manufacturing of Portable Steel Bridge for Hobiganj (S-S-R) Length 30 Feet |
1989-1990 |
| 11 |
L.G.E.D. Khagrachari |
Manufacturing of Portable Steel Bridge (S-S-R) Length 50 Feet |
1989-1990 |
| 12 |
L.G.E.D. Khagrachari |
Manufacturing of Portable Steel Bridge (S-S-R) Length 70 Feet |
1989-1990 |
| 13 |
Mr. Md. Mossabir, Sylhet |
Manufacturing of Portable Steel Bridge (S-S-R) Length 30 Feet |
1989-1990 |
| 14 |
Bangladesh Petroleum Corporation |
Manufacturing of Portable Steel Bridge (D-S-R) Length 30 Feet |
1989-1990 |
| 15 |
Nabiganj Thana, Hobiganj |
Manufacturing of Portable Steel Bridge (Light Vehicle) Length 20 Feet |
1989-1990 |
| 16 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 240 Feet |
1990-1991 |
| 17 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 120 Feet |
1990-1991 |
| 18 |
L.G.E.D. Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 200 Feet |
1990-1991 |
| 19 |
L.G.E.D. Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 40 Feet |
1990-1991 |
| 20 |
L.G.E.D. Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 80 Feet |
1990-1991 |
| 21 |
L.G.E.D. Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 80 Feet |
1990-1991 |
| 22 |
L.G.E.D. Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 100 Feet |
1990-1991 |
| 23 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 60 Feet |
1990-1991 |
| 24 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 80 Feet |
1990-1991 |
| 25 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 70 Feet |
1990-1991 |
| 26 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 100 Feet |
1990-1991 |
| 27 |
Tea Garden Sarak Parishad, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 50 Feet |
1990-1991 |
| 28 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 30 Feet |
1990-1991 |
| 29 |
L.G.E.D. Hobiganj |
Manufacturing of Portable Steel Bridge (D-S-R) Length 80 Feet |
1991-1992 |
| 30 |
Forest Research Institute, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 40 Feet |
1991-1992 |
| 31 |
Chittagong City Corporation |
Manufacturing of Portable Steel Bridge (S-S-R) Length 40 Feet |
1991-1992 |
| 32 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 80 Feet |
1991-1992 |
| 33 |
Bangladesh Small & Cottage Industries |
Manufacturing of Portable Steel Bridge (S-S-R) Length 20 Feet |
1991-1992 |
| 34 |
Bangladesh Gas Fields Corporation, Sunamganj |
Manufacturing of Portable Steel Bridge (D-S-R) Length 50 Feet |
1992-1993 |
| 35 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 60 Feet |
1992-1993 |
| 36 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 90 Feet |
1992-1993 |
| 37 |
L.G.E.D. Manikganj |
Manufacturing of Portable Steel Bridge (S-S-R) Length 50 Feet |
1993-1994 |
| 38 |
B.W.D.B., Dhaka |
Manufacturing of Portable Steel Bridge (D-S-R) Length 100 Feet |
1994-1995 |
| 39 |
United Nations High Commissioner for Refugees (UNHCR), Cox's Bazar |
Manufacturing of Portable Steel Bridge (D-S-R) Length 100 Feet |
1994-1995 |
| 40 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 60 Feet |
1994-1995 |
| 41 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 70 Feet |
1994-1995 |
| 42 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (S-S-R) Length 50 Feet |
1994-1995 |
| 43 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 50 Feet |
1994-1995 |
| 44 |
Bangladesh Water Development Board |
Construction of 50 Feet long and 12 Feet width Portable Steel Bridge. (Double-Single) |
1995-1996 |
| 45 |
Bangladesh Gas Fields Corporation |
Construction of Portable Steel Bridge (30 Ton) Double-Single (Length 40 feet) |
1995-1996 |
| 46 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable steel bridge (D-S-R) 100' x12' |
1995-1996 |
| 47 |
Chittagong City Corporation, Chittagong |
Portable Steel bridge (S-S-R) Length 70 Feet |
1996-1997 |
| 48 |
Dhaka City Corporation, Dhaka |
Road Cross Foot Over Bridge at Jatrabari Length 380 Feet |
1997-1998 |
| 49 |
Chittagong Dill Tract Development Board, Khagrachari |
Portable Steel bridge (S-S-R) Length 300 Feet |
1997-1998 |
| 50 |
Chittagong City Corporation, Chittagong |
Manufacturing of Portable Steel Bridge (D-S-R) Length 60 Feet |
1998-1999 |
| 51 |
Bangladesh Army, Double-Mooring, Ctg |
Manufacturing of Portable Steel bridge 100ʹ x 12ʹ for Chimbuk Thanchi Project |
1998-1999 |
| 52 |
Bangladesh Army, Double-Mooring, Ctg |
Manufacturing of Portable Steel bridge 100ʹ x12ʹ (D-S-R) |
1998-1999 |
| 53 |
Chittagong Hill Tract Development Board, Khagrachari |
Manufacturing of Portable Steel Bridge (S-S-R) Length 200 Feet |
1999-2000 |
| 54 |
Chittagong Hill Tract Development Board, Khagrachari |
Manufacturing of Portable Steel Bridge (S-S-R) Length 200 Feet |
1999-2000 |
| 55 |
Bangladesh Petroleum Exploration & Production Company Ltd. |
Manufacturing of Portable Steel Bridge (D-S-R) Length 120 Feet |
2000-2001 |
| 56 |
Bangladesh Army, Double-Mooring, Ctg |
Manufacturing of D-S-R Portable steel bridge (Length 40') |
2000-2001 |
| 57 |
Bangladesh Army, Cox's Bazar |
Portable Steel bridge (D-S-R) Length 100 Feet |
2000-2001 |
| 58 |
Bangladesh Army, Cox's Bazar |
Portable Steel bridge (D-S-R) Length 60 Feet |
2000-2001 |
| 59 |
Bangladesh Army, Cox's Bazar |
Portable Steel bridge (D-S-R) Length 40 Feet |
2000-2001 |
| 60 |
LGED Agargon Dhaka Ref. LGED/XEN/Dhaka/RDP- 11/4/845 Dated 18/02/03 |
17M X 3.54M 5(Five) Nos. (S-S-R) Steel Bridge Construction Cold galvanizing (mn) |
2002-2003 |
| 61 |
Bangladesh Army, 16 ECB Doublemooring, Chittagong (1) 609/Project/14/B B, dated 02-04-03 (2) 609/Project/14/B B, dated 07-04-03 |
Portable Steel Bridge (D-R-S): a) Length 40 Feet b) Length 160 Feet c) Length 240 Feet |
2003-2004 |
| 62 |
Dhaka City Corporation: a. Mirpur-275ʹ (58,88,464) b. Mirpur-381ʹ (81,77,5241) c. Uttara-132ʹ d. Badda-133ʹ (24,15,263) |
Footover Steel Bridge |
2003-2004 |
| 63 |
19 ECB Army Camp Dhampara. |
80’ x12’(D-S-R) Portable Steel Bridge (Cold Galvaniging) |
2003-2004 |
| 64 |
16 ECB Double Mooring Chittagong. |
Manufacturing of 80ʹx12ʹ D-S-R Bailey Bridge, Total=240ʹ-0” |
2004-2005 |
| 65 |
16 ECB Double Mooring Chittagong. |
Manufacturing of 80ʹx12ʹ D-S-R Steel Bailey bridge, 50ʹx12ʹ Total=180ʹ |
2004-2005 |
| 66 |
Rajshahi City Corporation |
Steel Footover Bridge |
2004-2005 |
| 67 |
19 ECB Dhampara Army Camp Ctg. |
Manufacturing. of 100ʹx12ʹ (D-S-R) bridge |
2004-2005 |
| 68 |
16 ECB Double Mooring Chattogram |
Repair of Steel Bridge Components (D-S-R) a) Length 130 Feet b) Length 50 Feet c) Length 40 Feet d) Length 220 Feet |
2004-2005 |
| 69 |
Bangladesh Gas Fields Com. Ltd. |
(40ʹx12ʹ) D-S-R Portable steel bridge construction and installation works |
2005-2006 |
| 70 |
Rajdhani Unnayan Kartripakkha (RAJUK), Dhaka |
Foot over bridge at Basabo of Dhaka Mohanagar |
2006-2007 |
| 71 |
Rajdhani Unnayan Kartripakkha (RAJUK), Dhaka |
Steel Footover Bridge in Khilgaon Bagicha area |
2006-2007 |
| 72 |
Rajdhani Unnayan Kartripakkha (RAJUK), Dhaka |
Footover Steel Bridge adjacent to Khilgaon Bagicha Mosque |
2006-2007 |
| 73 |
Rajdhani Unnayan Kartripakkha (RAJUK), Dhaka |
Footover Steel Bridge on DIT Road from East Rampura Alley to Rampura Bazar |
2006-2007 |
| 74 |
CEPZ |
Portable Steel Bridge Length 80 Feet |
2006-2007 |
| 75 |
CEPZ |
Portable Steel Bridge Length 90 Feet |
2006-2007 |
| 76 |
BGMEA, Dhaka |
Steel Bridge. Length 30 Feet |
2006-2007 |
| 77 |
17 ECB, Baufol, Army Camp, Cox's Bazar |
Construction of DSR Steel Bridge (Dimension: 70ʹ x 12ʹ x 6˝) at Ali Kadam Thanchi Road |
2007-2008 |
| 78 |
LGED, Dhaka |
Steel Bridge (D-R-S) Length 110 Meter |
2008-2009 |
| 79 |
17 ECB, Jhautotala, Army Camp, Cox's Bazar |
Portable Steel Bridge (D-S-R) 80x13 x 6 mm |
2008-2009 |
| 80 |
BD Gas Field Company Ltd |
Bridge (D-S-R) Length 60 Feet |
2009-2010 |
| 81 |
BD Gas Field Company Ltd |
Bridge (D-S-R) Length 40 Feet |
2009-2010 |
| 82 |
BGMEA |
Manufacturing of 30ft SSR portable steel Bridge |
2009-2010 |
| 83 |
RHD Rajshahi |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 84 |
RHD Sylhet |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 85 |
RHD Chittagong |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 86 |
RHD Khulna |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 87 |
RHD Comilla |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 88 |
RHD Barisal |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 89 |
RHD Rangpur |
Repair of Damaged Deck of Portable Steel Bridge |
2009-2010 |
| 90 |
RHD Dhaka |
Repair of Damaged Components of Portable Steel Bridge |
2009-2010 |
| 91 |
Stern House |
Manufacturing supply of 01 nos 100 ft(D-S-R) PSB |
2009-2010 |
| 92 |
RHD Rangpur |
Construction of 22.95 m length foot over steel Bridge |
2010-2011 |
| 93 |
Chittagong Port Authority (CPA) |
Manufacturing, Supplying Carrying of 19.80 m long Foot over Bridge with Double stair at “custom moor in front of port |
2011-2012 |
| 94 |
Chittagong Port Authority (CPA) |
Manufacturing, Supplying Carrying of 26.80 m long Foot over Bridge with Double stair at “custom moor to salf gola crossing |
2011-2012 |
| 95 |
Chittagong Port Authority (CPA) |
Manufacturing, Supplying Carrying of 30.00 m long Foot over Bridge with Double stair at “Port connecting rod at east Resident Area” |
2011-2012 |
| 96 |
Chittagong Port Authority (CPA) |
Manufacturing, of 12.00 m long steel bridge on the pond of mosave at south Resident area of port |
2011-2012 |
| 97 |
Incontrade Ltd. |
Manufacturing of 110 feet length and 11 feet width long portable steel bridge at 9 no |
2011-2012 |
| 98 |
RHD Chittagong |
Fabrication, Carrying & Erection of 34.00 m long steel Foot over Bridge. |
2011-2012 |
| 99 |
RHD Faridpur |
Beautification of 91.44 m long portable steel Bridge Ouer kumar river |
2011-2012 |
| 100 |
BSRM |
Fabrication, Supply and installation of a Double single Portable steel Bridge |
2012-2013 |
| 101 |
M/S Abdul Monem Ltd |
Padma Bridge bypass road’s 03 nos D-S-R type steel bridge |
2013-2014 |
| 102 |
Chittagong Port Authority(CPA) |
Causeway |
2013-2014 |
| 103 |
M/S A.H Construction |
Manufacturing of a Portable steel bridge |
2013-2014 |
| 104 |
Tangail Pourashava, Tangail |
Damage Bridge Repairing work Length 32 Meter |
2013-2014 |
| 105 |
RHD, Rangpur |
Extension of existing footover bridge of Rangpur Bypass (N-5) Road |
2014-2015 |
| 106 |
Sylhet City Corporation |
Fabrication, Carring and Installation of a 01 (one) no Footover Steel bridge at Modhuban Point under Sylhet City Corporation |
2014-2015 |
| 107 |
Marine Fisheries Surveyllance Check Post, Patenga, Chattogram |
Causeway including filling works Length 20 Feet |
2014-2015 |
| 108 |
Bangladesh Navy (BN) |
Gangway Extension for BN Length 5 Meter |
2015-2016 |
| 109 |
RHD, Sathkhira |
Replacement of old deck plate with new plate including fitting-fixing of Baily Bridge (Morichap Bridge) Length 242.42 Meter |
2015-2016 |
| 110 |
Bangladesh Navy (BN) |
01 in no cause way Length 51 Meter (with steel gangway Length 30 Meter) |
2017-2018 |
| 111 |
Public Works Department, Segun Bagicha, Dhaka |
Gangway (Length 7.62 Meter) for Double Connection of Vehicle Shed cum Barracks with Anti-Corruption Commission Head Office |
2017-2018 |
| 112 |
Chittagong Port Authority (CPA) |
Constructions of passengers ship landing station with steel Causeway (Length 60 Meter), Gangway (Length 15 Meter) and pontoon |
2017-2018 |
| 113 |
Chittagong Port Authority (CPA) |
Constructions of passengers ship landing station with steel Causeway (Length 60 Meter), Gangway (Length 15 Meter) and pontoon |
2017-2018 |
| 114 |
RHD Bagerhat |
Execution of the works replacement of old deck plate with new plate including fitting and fixing of baily bridge Length 49.58 Meter |
2018-2019 |
| 115 |
Chittagong Export Processing Zone (CEPZ), South Halishahar, Chattogram-4223 |
Footover Steel bridge Length 33.34 M |
2018-2019 |
| 116 |
Bangladesh Navy (BN) |
Ashrayan Project-3 (Marinized steel fixture works) |
2018-2019 |
| 117 |
Chittagong Port Authority (CPA) |
Footover Steel Bridge Length 18.80 M |
2020-2021 |
| 118 |
Sadar Daptar 34, Engineer Construction Bridge |
Construction of Bailey (Portable Steel) Bridge 1. Length 30.48 Meter 2. Length 24.84 Meter |
2021-2022 |
| 119 |
Sylhet City Corporation (SCC) |
Construction of Footover Bridge at Humayun Rashid Chattar Length 29.30 M |
2021-2022 |
| 120 |
20 ECB, Double Mooring Army Camp, Chattogram |
Repair Works of 1 × Bailey Bridge (Laimipara Bridge-1) |
2022-2023 |
| 121 |
Eastern Refinery Ltd (ERL) |
Renewal and Replacement Work of 04 nos Walkway at Dolphin Oil Jetty-7 under ERL |
2022-2023 |
| 122 |
Jamuna Oil Company Limited |
Gangway (Length 16.764m) |
2023-2024 |
| 123 |
Department of Shipping (DOS) |
2 nos Causeway: 1. Length 50m 2. Length 18m 2 nos Gangway (Length 9m) |
2023-2024 |
| 124 |
Chittagong Urea Fertilizer Ltd (CUFL) |
Wooden Deck Replacement by Chequered Plate of CUFL Walkway |
2023-2024 |
| 125 |
Mymensingh Road Division |
Restoration of Damaged 42.03m Span Steel Semi through BUG Truss “Khiru Steel Bridge” |
2023-2024 |